Project updates, press, and studio news from Tim Gorter Architects.

Spring 2026

Spring 2026

The 480 SF kitchen now opens to the garden through new glazed walls, with a walnut island anchoring the open plan.

Spring 2026

TGA begins renovating a Spanish Colonial home in Montecito, adding a recording studio ADU.

Park Lane Residence Kicks Off

Tim Gorter’s latest column explores buildings that sense and adapt to their occupants.

"Buildings That Listen" in the Sta. Barbara Independent

Fall 2025

The renovation strengthens the entry sequence and connects the house to its outdoor spaces, with completion expected by year end.

Fall 2025

Phase 1 remodels the main house and guest house and expands the pool area with an outdoor kitchen and dining.

Santa Barbara Estate Phase 1 Breaks Ground

Fall 2025

The Mission Canyon kitchen opens to the garden through new glazed walls, with a 12-foot walnut island at its center.

Preliminary work begins on a new family residence on a ranch between Santa Barbara and Ojai.

Fall 2025

Avocado Ranch Project Kicks Off

Fall 2025

Tim Gorter joined Clean Coalition's Santa Barbara SUN Day 2025 to discuss Passive House design.

Fall 2025

TGA and Clean Coalition are developing a Passive House ADU for Santa Barbara's pre-approved ADU database.

TGA x Clean Coalition: Passive House ADU Prototype

Spring 2025

Tim's latest column argues that designing for fire resilience is an ethical responsibility.

Spring 2025

TGA is designing an 800 SF, 2-bed, 2-bath ADU in Santa Barbara, with a warm, modern look that complements the existing ranch home.

New Concept Design for ADU Completed

Spring 2025

Construction is well underway, targeting a September completion.

Fall 2024

The modular home, built with Bevyhouse, has Coastal Commission approval and will ship in 24 factory-built pieces.

Fall 2024

The approval clears a major milestone for transforming the property into a family compound.

Fall 2024

"Passive House Design for a Net-Zero Future" explores Passive House as a new sustainability standard.

Summer 2024

TGA has moved to 129 El Paseo, Santa Barbara, CA 93101.

New TGA Studio

Summer 2024

The renovation strengthens the entry sequence, tightens the plan, and links the house to its outdoor spaces.

Montecito Residence Begins Construction

Summer 2024

Ellie Stathaki explores how TGA turned a tract home into an open, contemporary residence.

Summer 2024

Passive House design sharply cuts a building's energy use.

Fall 2026

The remodel reorganizes the plan for hosting and quiet retreat, with wildfire-resilient detailing and a high-performance envelope.

Fall 2026

TGA’s new studio is at 701 Anacapa St., Unit B, in downtown Santa Barbara. Tim joins the Trust for Historic Preservation’s Presidio Neighborhood program.

TGA Moves to Los Arcos Buildings

Fall 2026

Phase 1 construction by DD Ford begins in December.

Fall 2026

A remodel and addition on a steep hillside lot with ocean views, built by Allen Construction.

Eucalyptus Hill Project Underway

Fall 2026

Construction of the Montecito main house begins in November, while the recording studio ADU design continues.

Park Lane Construction Begins

Fall 2026

Available to design and consult on Passive House projects internationally.